CASE STUDY
Heavy Machinery Relocation: 800MT
COMBINED TRANSPORT Challenge Across Asia
Project Details
From
:
Korea Factory
To
:
Chennai, India
Mode
:
Land + Sea + Land
Total Weight
:
4500 RT - Breakbulk
Cargo
:
2000 & 500ton Press
Our Challenge
The project involved relocating a 2,000-ton press machine and a 500-ton press machine from Korea to India. The scope required dismantling the machinery, packing, and transporting it with precision. The heaviest single piece, the 150-ton crown and accessories, posed unique challenges in handling, loading, and shipping. The operation demanded meticulous planning for heavy haulage, export documentation, and multimodal transport solutions.
Our Solution
-
Conducted a site survey in Korea to plan dismantling and transport
-
Deployed an expert rigging team to dismantle the press machines in factory
-
Arranged heavy-haul transport to Masan port and shipped via breakbulk & container vessel to India
-
Delivered all components on time and damage-free to the client in India
The Result
The project was completed successfully, with the 2,000-ton and 500-ton press machinery safely dismantled, packed, and shipped to India. The 100-ton crown was handled with precision, demonstrating Go Gauge's capability to manage complex heavy lift projects. The client appreciated the seamless execution, timely delivery, and our attention to detail in every phase of the project.