Factory Relocation Services
Go Gauge Logistics delivers engineered factory relocation solutions with precision, safety, and global expertise.
We manage end-to-end industrial moves — from dismantling, packing, and consolidation to reinstallation — ensuring minimal downtime and full compliance throughout the process.
With a network of 50+ partners across 25 countries including Europe, Russia, Turkey, India, the USA, and Australia, we specialize in cross-border relocations, handling disassembly in one country and seamless setup in another.
Every relocation is planned, executed, and optimized for cost efficiency, operational continuity, and project success.
-
Safe shutdown of machinery and production lines
-
Electrical/utility disconnection and tagging
-
Precision dismantling using certified riggers
-
MWS/Engineering supervision wherever required
-
Custom wooden crating, skid fabrication & anti-corrosion wrapping
Export-grade packing as per ISPM & project standards
Labeling, part marking, packing list mapping for reinstallation
Hydraulic lifting, jacking, skating, and SPMT support
Cranes, gantry systems & engineered lifting plans
Certified lifting gears with load test documentation
-
Local and international multimodal logistics
-
Route survey, permits, escort & police approvals
-
Yard storage, consolidation & customs handling
-
-
On-site alignment, leveling & bolting
-
Rewiring, re-hooking of utilities, lubrication systems
-
Trial runs, compliance checks & commissioning assistance
-
-
On-site alignment, leveling & bolting
-
Rewiring, re-hooking of utilities, lubrication systems
-
Trial runs, compliance checks & commissioning assistance
-
FAQ
A factory relocation service covers the complete process of dismantling, packing, transporting, and reinstalling industrial machinery and production equipment from one facility to another. Go Gauge manages the entire project scope: pre-move survey, decommissioning planning, custom packing and crating, international ocean or air freight, customs clearance, local transport, and installation coordination at the destination facility.
Yes. Go Gauge has executed international factory relocations across continents, including moves from the USA, Europe, UAE, Japan, Taiwan, and South Korea, as well as within Southeast Asia. We coordinate all cross-border documentation, international freight, and on-site handling at both origin and destination facilities.
Timelines depend on the size and complexity of the facility, customs procedures at origin and destination, and transport modes used. A typical mid-size plant machinery relocation takes between 8 and 15 weeks from initial survey to completed reinstallation. Our project management team provides a detailed project schedule before work begins.
Go Gauge has executed factory relocations involving over 100,000 CBM of industrial machinery, spanning moves across Asia, the Middle East, Europe, and the Americas. Our team manages every stage — from factory decommissioning and packing through to ocean freight, customs clearance, and inland transport at the destination.