top of page

Mega Lift Movement: 200-Ton Dome from Mundra to Jebel Ali

Go Gauge executed the seamless door-to-port logistics of a 200-ton heavy-lift dome, part of a 3500 FRT breakbulk movement from Mundra, India to Jebel Ali, UAE. This complex project required detailed engineering, vessel chartering, route planning, specialized lifting, and close coordination across multiple handling points.

Our Networks

bottom of page